Home Products & Services

Ji’nan Lake Road, Lake Road today I see here around the thermal construction-matlab 等高线�

Ji’nan Lake Road, Lake Road, the thermal construction here how bypass the Qilu Evening News reporter from · Qilu one point Ji’nan flyover Traffic Police Brigade learned 20 am zero, West Lake Road and lake has begun construction of thermal period lasted until October 31st. As the main road to the East and west of Ji’nan, the traffic is large, the construction will have an impact on the surrounding traffic. In this regard, the flyover traffic police also issued a bypass scheme, convenient the detour. Traffic police, road construction peak as early as seven points to nine points, at sixteen points to nineteen points, the main road intersection heihuquan Road, Li Huang Lu, Shuitun Road, North Road, North Street, East Street, Shun Shun production street. Within the scope of the project there are 45 bus, road, road, road, road, 122,, BRT5 Road, K53 Road, the bus line during the normal construction of the passage of time in the construction of the bus line, 106. Construction time is from September 20th to October 25th. The heat pipe network project is divided into two sections, groove groove width is about 2153 meters, 3.5 meters, the construction area width of 4 meters, taken at night (22:30 to 5:30 the next day) construction. A bid for Ji’nan Lake Road (North Road Paris garden) thermal engineering, two section of Ji’nan Lake Road (North Road to heihuquan Road) thermal engineering. According to the construction section, traffic police traffic organization scheme. Among them, heihuquan Road intersection to Paris garden, take a semi closed construction scheme; river lake road and elevated intersection 114 meters east (Lake Garden opposite), take a semi closed construction scheme. Cross the intersection of the implementation of the phased construction at night, laying steel plate during the day, to ensure the normal traffic vehicles; the construction of the main junction to take phased construction. Take the night construction, during the construction of small operation area using a steel enclosure, bull barrels, the isolation cap closed, flashing lights and electronic guide is arranged in the construction period and arrange detour sign, traffic control officers traffic control, traffic detour traffic guide society. (Qilu Evening News reporter Zhang Tailai · Qilu point) [the manuscript contains text, images and audio and video data, all copyrights are the Qilu Evening News, any media or individuals shall not be reproduced without authorization, and offenders will be prosecuted according to law. ]相关的主题文章: